Chapel arches and details complete

The front wall of the chapel on the rostrum has the arches and drywall details complete.
Published with Blogger-droid v1.6.5

Paint has begun

All of the door frames have been primed and will be painted this evening. Also many of the walls have been painted as well.
Published with Blogger-droid v1.6.5

Wednesday, November 24, 2010

Ceiling tile glue and bulkhead coming down

Now that the Wondoor folding partition has been relocated, we were able to take down the wood framing for the old location. It took an entire day to remove the near ton of material used to support the doors. We are now laboriously removing the old ceiling tile glue with hammers and chisel. We are trying to get ready to install new ceiling tile next week.
Published with Blogger-droid v1.6.5

Drywall grid installed

All of the grid for the new classrooms has been installed. As soon as the duct work is installed, we will be ready to hang drywall and glue up the ceiling tile.
Published with Blogger-droid v1.6.5

store front doors

Many of the entry doors have been installed. We have two of the entries and the arch top windows in, and would have had more but some of the glass arrived wrong and could not be installed.
Published with Blogger-droid v1.6.5

Tuesday, November 16, 2010

Site concrete is nearly complete

We have poured the entry and most of the sidewalks. We now only have the other entry, light pole bases and now strips to complete.
Published with Blogger-droid v1.6.4

Monday, November 1, 2010

Brick work nearing completion

Brick masons finished with the columns last week and now only need to fix a few areas and do the brick window sills. The Knox box and granite address have also both been installed.
Published with Blogger-droid v1.6.4

Friday, October 29, 2010

Brick columns complete

The brick finally arrived from South Carolina this week and the brick masons are about done. The 4 large columns at the north side are done and add a lot of character to the large wall.
Published with Blogger-droid v1.6.3

Tuesday, October 26, 2010

Drywall started

The drywall is being Hung in the new foyer. The installers hope to have the building almost complete by the end of the week.
Published with Blogger-droid v1.6.3

Thursday, October 21, 2010

concrete Aprons

The remaining mechanical pad sections have been poured as well as several sections of the concrete aprons. As soon as the remaining brick arrive and is laid, we will back fill and pour all of the sidewalks.
Published with Blogger-droid v1.5.9

Friday, October 15, 2010

Gutters and fascia

The metal is going up around the building. Much of the fascia is up, and today several sections of gutters and downpour were installed.
Published with Blogger-droid v1.5.9

Thursday, October 14, 2010

Insulation going in

Insulation started going in the building yesterday evening. A good portion of the chapel ceiling is done, as well as many of the exterior walls.
Published with Blogger-droid v1.5.9

Tuesday, October 12, 2010

Brick arches over the windows

Brick has been laid around the east side of the building. The only part that is left now is a little at the north and the main entry on the east side.
Published with Blogger-droid v1.5.9

Wednesday, October 6, 2010

Brick on the east side of the building

The masons have started brick on the east side of the building.
Published with Blogger-droid v1.5.9

Monday, October 4, 2010

The brick work is almost halfway complete

the brick masons have completed all of the brick work on the east side of the building. Only a little bit on the northside and all of the west side remain.
Published with Blogger-droid v1.5.9

Finishing framing items

the framer spent most of the day adding the remaining ceilings and plywood to shear walls. They also added the missing catwalk and moved several closet doors in the cultural center.
Published with Blogger-droid v1.5.9

Friday, October 1, 2010

Brick by brick

With a crew of 6 brick masons, there is more progress being made. They plan to work Saturday and finish the columns at the entry.
Published with Blogger-droid v1.5.9

Wednesday, September 29, 2010

Brick Advancements

We have continued laying brick. They are about 25% done.
Published with Blogger-droid v1.5.9

Tuesday, September 28, 2010

New Windows

The new Windows have been installed. White Windows have replaced the old bronze colored Windows to match the new white doors, fascia, gutters, and vinyl fence. The windows are double glazed and argon gas filled, to be more energy efficient. These windows are also fixed, eliminating the need for church leaders to check that all the windows are locked before leaving after activities.