Wednesday, September 29, 2010
Tuesday, September 28, 2010
New Windows
The new Windows have been installed. White Windows have replaced the old bronze colored Windows to match the new white doors, fascia, gutters, and vinyl fence. The windows are double glazed and argon gas filled, to be more energy efficient. These windows are also fixed, eliminating the need for church leaders to check that all the windows are locked before leaving after activities.
Published with Blogger-droid v1.5.9
Friday, September 24, 2010
Brick work continues
The brick masons continue laying brick, turning one more corner today.
Published with Blogger-droid v1.5.9
Fire suppression branch lines and uprights
Many of the uprights for the existing plenum spaces have been installed. Several of the classrooms now have the pendants installed in the center of the tiles.
Published with Blogger-droid v1.5.9
Thursday, September 23, 2010
Brick is going up
Brick work has started. A crew started this morning on the west side of the building. According to the mason it will take about 2 weeks to complete.
Published with Blogger-droid v1.5.9
Progress on the roof
Both the north and west sides of the roof are complete. Tomorrow the eastern side and the ridge vents should be finished.
Published with Blogger-droid v1.5.9
Wednesday, September 22, 2010
Brick and mortar are on site
The brick and associated materials arrived this morning. The brick mason was on site to review the project, and will start laying brick tomorrow.
Published with Blogger-droid v1.5.9
Roofing has begun
The roofers started this morning, and finished a little more than half of the west side. We should finish all of it this weekend.
Published with Blogger-droid v1.5.9
Friday, September 17, 2010
Decorative elements added
Most of the cornice work has been added to the entries and north end. The remaining pieces will be installed this week.
Published with Blogger-droid v1.5.9
Rostrum floor installed
The new rostrum floor has been framed. It features a handicapped accessible ramp, as well as multi leveled pew seating.
Published with Blogger-droid v1.5.9
Wednesday, September 15, 2010
Gas service run to the building
The gas company ran the gas line to the building today. Gas will allow the church to have a tankless water heater to fill the font, as well as having gas furnaces.
Published with Blogger-droid v1.5.9
Tuesday, September 14, 2010
Asphalt parking is complete
All of the asphalt for the new parking spaces has been laid and tested. The new paving adds an additional 37 parking spaces to the parking lot.
Published with Blogger-droid v1.5.9
A look at the Framing
The framing is almost complete. We still lack some hold downs, blocking, and fascia.
Published with Blogger-droid v1.5.9
Monday, September 13, 2010
The windows for the Church have arrived
The 21 new Windows for the building arrived this morning. None of them broke during their transport.
Published with Blogger-droid v1.5.9
Thursday, September 9, 2010
The first of the Fire Suppression main is being Hung
This morning the sprinkler pipe arrived, and crews started hanging it. They have about 75' of the mains done. They will continue next week with the remainder of the mains. We are still waiting for the branch lines to be fabricated.
Published with Blogger-droid v1.5.8
Wednesday, September 8, 2010